Thank you for your interest in our PMP ITTO Process Chart.

Download it by clicking here.  

Don't Get Frustrated With PMP ITTO


worth $9.99

worth $9.99

worth $9.99

worth $9.99

$39.96   $23.98

Accelerate your learning by using the best ITTO Tools based on the PMBOK Guide 6th edition.

 Why Are ITTO Annoying And Frustrating?


1.

PMBOK Guide 6th edition is a huge book. It has close to 1000 pages.

2.

There are more than 1000 ITTO across 49 processes.

3.

It is next to impossible to memorize the ITTO.

Learning ITTO is an annoying and serious problem. But, like many other things in life, you have to overcome it.

Can you pass the CAPM / PMP exam without learning ITTO?

No! Learning ITTO is a necessary evil.

Hey! I am Praveen Malik.

I passed my PMP exam in the year 2005. In those days the PMBOK Guide was much thinner. It was about the one-fourth the size of today's version. The number of processes and ITTO were much less.


In 2005, I had many anxious moments while preparing for the PMP Exam. I just could not memorize the ITTO but I still passed the exam with flying colors.


How did I pass? I found some unique ways to learn and understand the ITTO.

Read on to find out some of the unique methods to learn ITTO

Get Rid of "How To Learn ITTO?" Problem


1. Learn the Concepts

Start your study by learning and understanding the utility of the PMBOK Guide processes.

2. Learn the Relationships

Understand the relationships between processes by understanding the flow of Inputs and Outputs.

3. Validate your Learning

Validate your learning by checking if your learned everything and are ready for the exam.

The Best Tools To Learn ITTO


PMP ITTO Concepts eBook

Understand PMBOK Guide's process flow to confidently solve ITTO questions.

  • Find out the importance of PMBOK Guide's processes & ITTO.
  • Logically understand PMBOK Guide's concepts through flowcharts.
  • Determine relationships between outputs & inputs across processes.
  • Based on PMBOK Guide 6th edition.

PMP Mind Maps

Learn PMBOK Guide's processes and ITTO by using the power of visual learning.

  • Use scientifically proven whole-brained approach to learn ITTO.
  • Creatively learn the PMBOK Guide's terms through pictures.
  • Understand & remember one PMBOK Guide process at a time.
  • Based on PMBOK Guide 6th edition.

PMP ITTO Cheat Sheet

Accelerate your ITTO learning by connecting outputs and inputs across KA and PG.

  • Get a 360 view of PMBOK Guide by connecting outputs and inputs across KA/PG.
  • Cross-reference any PMBOK Guide term in a fraction of second.
  • Search and filter any term related to 49 processes.
  • Based on PMBOK Guide 6th edition.

PMP ITTO Quiz

Gain confidence of cracking the PMP exam by validating your ITTO knowledge.

  • Predict your future (that you will pass in the PMP exam) by practicing ITTO questions.
  • Ensure that there are no surprises in the real test.
  • Self-assess and validate your knowledge of PMP ITTO.
  • Based on PMBOK Guide 6th edition.

What Others Are Saying About ITTO Learning Tools


A must have tool for ITTO's

I feel that 90% of the test is on the ITTO's and I've struggled with answering some of the questions your explanations will help me focus on the right wording to be able to unravel the certification questions.


A must have tool for itto's

Victoria Sinon  //  Operations Manager

Memorizing ITTO with understanding each process worked for me

Instructions to handle exam questions helped me a lot. I studied for this exam for 4 months. I memorized ITTO while reading book. I read PMBOK 2 times and did many exam simulator (one suggested by you - PMP simulator) concept to understand the concept of variety of questions.


However memorizing ITTO with understanding each process worked for me.

Nalini Srivastava //  Systems Control Engineer at GE

Thanks for putting all the useful information together

I took the exam and passed it with Above the Target Rating. There were a lot of questions that were testing the understanding/ definitions of the processes, tools and techniques.


Thanks for putting all the useful information together. Change Requests and Work Performance Data/Info/Report section helped me to better understand the flow of the outputs.

Marisa W  //  Project Analyst with Canadian Government

What You'll Get When You Purchase Today


ITTO Concepts eBook

worth $9.99

ITTO Mind Maps

worth $9.99

ITTO Cheat Sheet

worth $9.99

ITTO Quiz

worth $9.99

You pay $39.96 $23.98 only.

100% Satisfaction Guaranteed

Secure Payment

Credential Exam Success Stories


“Praveen is a goal oriented Manager. Always saw to it that all tasks were finished on time as per requirements. He has inspiring leadership qualities, he keeps peaceful working environment.”

- Sarika Agarwal -

“He is a dynamic speaker with never a dull moment. I was immediately impressed with his deep understanding of the topic, his passion for the opportunity and his commitment to servant leadership."

- Sunil Kumar -

“Mr. Malik is a keen and dedicated Project Management Consultant. He is very much focused on the content delivery. His guidance leads to crack the toughest exams like PMP in a very easy way. His honest guidance helps the participants in studies.”

- Pince Amjad Khan,PMP-

About The Author


I am a certified Project Management Professional (PMP®) with a rich 24+ years of experience.


I have been teaching PMP students since 2005. I have conducted several in-classroom & online PMP workshops and trained thousands of aspirants for the certification exam.


In my experience, many students dread PMP ITTO. Most of them delay taking the exam because of fear of ITTO. I have made a slew of products that can help you to overcome ITTO fear.

Praveen Malik

100% Satisfaction Guaranteed

Secure Payment

100% Satisfaction Guarantee

You are fully protected by my 100% Satisfaction-Guarantee. If you don't pass your PMP or CAPM exam, just let me know and I 'll send you a prompt refund.


And, that t is not all. I will also provide unlimited email support till you pass your credential exam.

Praveen Malik


Frequently Asked Questions


Should I wait for some more time before buying the tools if I have just started my exam preparation?

How will your Tools help me if I am near the end of my exam preparation?

Should I buy ITTO Learning Tools if I have not yet started the exam preparation?

Should I buy your Learning Tools if I want to start preparation after 3-6 months?


How does 100% satisfaction guarantee work?

Will you provide support, if I have a question?

Don't get bogged down by PMP ITTO. Use the right tools to tackle them.