PMP Formulas Cheat Sheet – Download 43 Formulas Pocket Guide

PMP Formulas / Project Management Formulas

pmp formulas cheat sheet

Are looking for a PMP Formulas Cheat Sheet or a small Pocket Guide?

You are at the right place. You can download a pdf guide having 43 formulas and 53 abbreviations.

PMP Formulas should be actually called Project Management Formulas. However, former title is more popular than the latter. I have rarely seen anyone using the term “Project Management Formulas”. This could be either because of the reputation of the PMP Exam or the popularity of PMBOK® Guide. But let us not delve into the reasons behind the name. You may call them by whatever name you like.

A great man once wrote.

What’s in a name?

William Shakespeare

PMP Formulas Cheat Sheet

I have seen my fair share of cheat sheets and pocket guides. I would be lying, if I said I have seen all. There would be tens of such guides available on the web. However, I can certainly claim to have seen the more popular ones. Most of these guides do not cover all the formulas. So, I thought, let me prepare a new one and share it with the PMP aspirants.

So here it is at absolutely no cost to you.

A few years ago, I started a PMP Prep LinkedIn Group to help the aspirants to pass the exam. I moderate the group and answer PMP related questions. The guide is available as part of the welcome kit for the members.

There are no charges for LinkedIn membership or group membership. These are absolutely free.

Go ahead! Join the group – Download your free pdf copy of the PMP Formulas Pocket Guide and enjoy other membership benefits.

 

 

Details of Pocket Guide

The Guide is based on the PMBOK Guide 5th Edition. It contains all the formulas defined or referred to in the PMBOK Guide 5th edition. It is the best and most comprehensive pocket guide. It is designed to be your constant companion and it will help you in your exam prep. It contains:

  • 43 Important Formulas
  • 53 Abbreviations
  • And more…


 

Does it really contain all the Project Management Formulas?

Yes. It contains all the formulas described in PMBOK Guide 5th edition. It is the best & most comprehensive pocket guide that can help you pass the the PMP Exam. The 2 page pdf guide contains:

  • Earned Value Management Formulas
  • Network Diagrams related Formulas
  • Estimation Formulas
  • Project Selection Methods Formulas
  • Expected Monetary Value Formulas
  • Communication Channels Formula
  • Procurement Management Formula

Just check it out yourself.

The proof of the pudding is in eating.

 

4 Practical Ways to Use The PMP Formulas pdf Guide

You can use the guide in any of the following four ways:

  • Print it, fold it and carry it in your pocket for memorizing the Formulas.
  • Print it and pin it beside your study table for quick reference while doing PMP questions.
  • Save it as Desktop background on your PC or Laptop for ready reference.
  • Save it on your mobile device for anytime viewing.

It is short. It is comprehensive. It is pocket friendly.

Don’t wait! Download it now.

 

 

I am confident that the Guide will serve the purpose it is meant for. However, if you feel that it can be improved further then don’t hesitate to leave a comment behind.

Good luck for the PMP Exam.

8 thoughts on “PMP Formulas Cheat Sheet – Download 43 Formulas Pocket Guide

  1. Praveen,

    I am interested in PMP exam and have started reading materials in preparation. PMP Formulas Guide was very useful.

  2. Hi Jesperson, Thank you for you comment. There is nothing sinister about the fair price. I am using a services that shows “fair price” by default. I cannot change it.

    Just put $0 and download.